11 KV CABLE JOINTING WORK
Before Laying A Cable, Joint Location Must Be Identified. Is Should Lie In Road Crossings, Water Logging Area, Communication Lines And Any Other Main Service’s Line. Joints Shall Be At Staggered Position By 2-3 Metres When 02 Or More Cable Has To Be Jointed. Before Jointing, Aluminium Conductor’s Oxide Film Shall Be Completely Removed By Scraping Or Flux. Joining Shall Always Be Done By A Certified And Experienced Jointer. For Jointing, There Are Various Jointing & Termination Kits. Mainly Used Are Heat Shrink, Cold Shrink, Push On, Tapex And Resin Cast Jointing Kits. Procedure Shall Be Strictly Follows As Per Manufacturer’s Guidelines. After Jointing And Termination, Dc High Voltage Test To Be Performed.
TYPES OF ACTIVITY WORK:-